Asset protection fees and charges

1 July 2025 to 30 June 2026

The non-refundable asset protection permit fee and refundable asset protection permit bond is based upon the type of works and is outlined in the table below.

There may be special circumstances where the asset protection permit bond is increased at Council’s discretion due to:

  • the extent of the works
  • the potential to cause damage
  • site conditions
  • the proposed development
  • the site is located on an arterial road.

Please note that a single street frontage is typically 15-20m wide. Corner blocks are considered to be 2 street frontages

Fee type Fee
Asset Protection
Minor works - Verandah deck, pergola, alfresco area, retaining walls, underpinning, restumping
Application fee (non-refundable) $500
Minimum bond per street frontage (refundable) $2000
Major works - Demolition and / or single dwelling construction, swimming pool or spa, carport, shed, garage, dependent persons unit, extension, addition/alteration, earthworks
Application fee (non-refundable) $640
Minimum bond per street frontage (refundable) $2500
Industrial or Warehouse
Application fee (non-refundable) $850
Minimum bond per street frontage (refundable) $3500
Multi-dwelling or subdivision - 2 dwellings/lots
Application fee (non-refundable) $850
Minimum bond per street frontage (refundable) $4500
Multi-dwelling or subdivision - 3-5 dwellings/lots
Application fee (non-refundable) $1130
Minimum bond per street frontage (refundable) $4500
Multi-dwelling or subdivision - 6-9 dwellings/lots
Application fee (non-refundable) $1410
Minimum bond per street frontage (refundable) $4500
Multi-dwelling or subdivision - 10 or more dwellings/lots
Application fee (non-refundable) $1690
Minimum bond per street frontage (refundable) $4500
Multi-storey complex/commercial development
Application fee (non-refundable) $2,820
Minimum bond per street frontage (refundable) $6000
Extend an Asset Protection Permit

The fee to extend an Asset Protection Permit is charged at half the current applicable permit fee and must be paid before an Asset Protection Permit extension has been granted. 

The Asset Protection Permit bond will be retained until the works are complete. Council may require an additional bond be paid as part of a request to extend an Asset Protection Permit, if the extent of damage or nature of works justifies this.